West Bay Lagoon Project

Main page: 32.2 kW

Details:
A 28.5 kWp On gird system

A 3.75   kWp Off grid system

System is installed over decorative steel beams over the house and car park shade

Average Annual Production:
42 MWh

Operating Hours:
12 hours

System will operate for:
The On-Grid system will be connected to Main Distribution Board

The Off-grid system is connected to the exterior lights and swimming pool machines